PROCUREMENT DECISIONS · A FREE WORKING DEMO
Supplier quote comparison calculator
Compare the quote you can actually buy.
A unit price, a pack price and an incomplete quote are different offers. Give suppliers the same request, include the freight and check what meets the specification and delivery limit.
No signup. Compare in your browser and export a JSON record of your inputs and result.

ONE REQUEST. THREE DIFFERENT OFFERS.
Find the lowest complete, eligible quote.
The example requests 120 USB drives with at least 64 GB capacity. Supplier B quotes packs of ten. Supplier C offers only 32 GB. Load the amended example to see what changes when B’s pack price rises from USD 90 to USD 95.
LOWEST COMPLETE, ELIGIBLE TOTAL
USD 1,140.00
Supplier B. Before tax, with the supplied freight.
Supplier C offers 32 GB against a 64 GB minimum. Its lower total does not make it eligible.
| Supplier | Whole packs / units | Goods + freight | Fit and price rank |
|---|---|---|---|
| Supplier A | 120 packs · 120 units | USD 1,175.00 | Eligible to comparePrice rank 2 |
| Supplier B | 12 packs · 120 units | USD 1,140.00 | Eligible to comparePrice rank 1 |
| Supplier C | 120 packs · 120 units | USD 1,136.00 | Does not meet requirements
|
Calculated in this browser tab. This workbench is excluded from session replay. The JSON export includes your inputs; refreshing resets the example. Enter zero freight only when it is confirmed included.
A RESULT YOU CAN EXPLAIN
Keep quantity, cost and fit separate.
For each quote, whole packs equal the required quantity divided by units per pack, rounded up. The total is whole packs multiplied by price per pack, plus the supplied freight. The final total rounds once to two decimals using half-up rounding. Equal displayed totals remain tied.
For Supplier B, 120 drives need 12 packs. At USD 90 per pack plus USD 60 freight, the total is USD 1,140. Supplier C totals USD 1,136, but misses the specification. After B’s amendment, B totals USD 1,200 and A’s USD 1,175 is lower.
The same pack rule matters at a different quantity: 121 drives require 13 packs from B, supplying 130 drives. The calculator shows the extra nine units instead of assuming that a supplier sells a fraction of a pack.
Before treating a result as a buying decision
- Confirm the specification and quoted lead time with each supplier.
- Confirm freight for the actual order. A blank charge stays unknown; it is not treated as zero.
- Use a consistent currency, tax basis and delivery starting point.
- Review stock, taxes, duties, discounts, minimum orders and commercial terms separately.
- When a quote changes, compare the current offers and review the approval decision again.
Microsoft’s RFQ overview describes quantities, delivery times and charges as part of comparing offers. This calculator and its synthetic example are Arcforth’s implementation.
WHEN THE DECISION NEEDS A WORKFLOW
What happens after the quote is chosen?
A comparison still needs a decision owner, an approval tied to the current quote and a clear handoff into the purchase order. That is where the product work begins.
Our CollectiveSpend walkthrough shows request intake and approval visibility. Review procurement software development when those decisions need to live inside your own product.
Bring the same example to a vendor demo.
Use the request, quotes and expected results to compare a configured platform with a custom build. The pack’s evaluation cases are proposed checks, not completed vendor test results.
For Dubai and UAE teams, review the Dubai product delivery guide and supplier portal development. The calculator works in AED as well as USD, GBP, EUR or AUD, with your own comparable inputs.
If the decision is whether to configure or build the surrounding software, use the procurement build-or-buy brief before comparing full-period cost.
Questions before you compare.
How do you compare supplier quotes on the same basis?
Start with one required quantity and specification. Confirm units per pack, price per pack, freight for the order, quoted delivery time and currency. This calculator rounds up to whole packs and ranks complete eligible quotes by goods plus freight, before tax.
Why can the lowest quote be excluded?
In the synthetic example, Supplier C offers 32 GB drives against a 64 GB minimum. Its lower price is not a comparable offer. A quote can also miss the supplied delivery limit. The specification decision is entered by you; the calculator does not inspect products or supplier documents.
Can I compare AED, USD, GBP, EUR or AUD quotes?
Yes, in one consistently quoted currency at a time. Each quote has its own currency label. A quote in another currency needs clarification and is not ranked. No exchange rate or conversion is supplied.
Does this calculate total landed cost or approve a supplier?
It calculates the supplied goods price plus freight, before tax. Duties, tax treatment, discounts, minimum-order terms, availability and other costs need separate review. It does not approve a quote, check stock, create an order or contact a supplier.